1 | Repair & Replacement of Damaged Internals at DA Tower 1 on DWG |
2 | E33 Slot 25 Oil Production & Gas Lift Flowlines on DWG |
3 | Replacement of WI Flow Control Valve 3C-FV522591 (Train 2) on DWG |
4 | Replacement of WI Flow Control Valve 3C-FV521591 (Train 1) |
5 | DWG-PCWU Riser R4 Cap Removal for Internal Camera Inspection |
6 | Gas Lift Diverter Valve Installation on DWG |
7 | DWG-PCWU Destruct Part of Ex Valve Support Notch & Construct Valve Support Cover Plates |
8 | DWG-PCWU Replacement of Non-Hazardous Open Drain Pipework |
9 | Replace Cracked Handrail Sockets on DWG |
10 | Installation of Spacer Brackett on DWG |
11 | Installation of Spacer Brackett on DWG (WN-3DTSZZ-CM-REQ-0154). |
12 | Slot 41 Oil Production & Gas Lift Flowline Installation on DWG |
13 | DWG DUQ E04 Slot 23 – 5 Off Gas Lift Diverters Valves Installation |
14 | DWG DUQ E04 Slot 23 – Gas Lift Flowline Installation |
15 | CDWG Replacement of Corroded Cable Tray |
16 | DWG (DUQ) E36 Slot26 Water Injection Flowline Installation P&S |
17 | E35 Slot-01 Gas Lift Flowline – Piping & Structural |
18 | DWG Relocation of Cable Tray Supports |
19 | E38 Slot 07 Oil Production and Gas Lift Flowlines Installation |
20 | Installation of permanent pipe supports in accordance with anomaly at DWG |
21 | DWG PCWU/Replacement of WI flow control valve 3C-FV522591 |
22 | E34 Slot 36 Oil Production and Gas Lift Flowlines |
23 | E34 (Slot-36) Choke Valve Replacement |
24 | Installation of New Life Raft & Ampelmann V-Dock Assembly on Chirag-1 |
25 | A09 Flowline Modification to Accommodate New X-mas Tree on Chirag-1 |
26 | Anomaly Repair of Corroded Main Deck Plating on Chirag-1 |
27 | Replacement of Corroded Handrail Panels on Chirag-1 North Helideck |
28 | A10Z Slot 20 X-mas Tree Change from 6 3/8″ Pneumatic to 5 1/8″ Hydraulic on Chirag-1 |
29 | Drilling Office Handrail Installation on Chirag-1 |
30 | Installation of Diagonal Bracer on Chirag-1 |
31 | Replacement of corroded steelwork on choke valves access platform |
32 | Chirag 1 CDWG 1146 Part 4 – Installation of Handrails |
33 | CDWG1348 Replacement of corroded supports of instrument devises – Water Injection system |
34 | Re-Routing Existing MEG Lines on Well Bay Area on Shah Deniz |
35 | Replacement of Corroded 2″ BFCC Open Drains Line on Shah Deniz |
36 | Shah Deniz Sewage Treatment Plant Upgrade |
37 | Installation of Additional Supports to Lighting Support Poles on Shah Deniz |
38 | Replace Corroded Pipe Spools 8″ Sea Water Line WS-507074-E01D on Shah Deniz |
39 | Replacement of Corroded HVAC Supports on Shah Deniz |
40 | Installation of Anti-Vibration Supports at Shah Deniz |
41 | Replacement of corroded atmospheric vent line 2-VA-457242 |
42 | Replacement of Corroded Steel Water Supply Pipes at Central Azeri to Plastic One |
Quruda icra olumuş layihələr
EA/WA Pipe Supports | McDermott Caspian Contractors International | January 2004 – September 2007 | |
HVAC Ductwork | Kentech | March 2004 – July 2005 | |
Call-Off Contract | Bos Shelf | Yanvar 2004 - May 2006 | |
WREP Repair Work | BP(GPC) | İyun 2004 - Aprel 2006 | |
Dada Gorgud Derrick Access Platform | Caspian Drilling Company | İyun 2006 - Noyabr 2006 | |
Additional fabrication and installation works (piping structure and steel structure) | Bentec | May 2004 - Yanvar 2009 | |
Fabrication of Pipe Spools | Tekfen-Azfen | March 2005 – August 2005 | |
Call-Off Works | Rolls-Royce | İyul 2005 - İyun 2009 | |
Fabrication of Access Platform & Walkways | Tekfen-Azfen | İyun 2005 - Noyabr 2005 | |
Istiglal rig installation works | BP/CSVC | İyun 2006 - Noyabr 2006 | |
GRE Pipefitter Supply | Petrofac | Sentyabr 2003 - Yanvar 2005 | |
Additional fabrication and installation works (piping structure and steel structure) | Technip | Yanvar 2004 - Sentyabr 2006 | |
Dənizdə işçilərin təmin edilməsi. | Maersk | Fevral 2005 - Avqust 2005 | |
FRP emalat işləri. | Amec-Tekfen-Azfen | Oktyabr 2005 - Noyabr 2007 | |
Supply of Offshore Trades (Shahdeniz) | BP | March 2006 – January 2007 | |
Additional fabrication and installation works (piping structure and steel structure) | Saipem | May 2004 - İyun 2007 | |
Fabrication of Pipe Spools | BP | İyun 2006 - Dekabr 2006 | |
Fabrication and installation works | Schlumberger | May 2008 - Noyabr 2008 | |
Installation works at BTC warehouse | BTC | March 2008 – May 2008 | |
Fabrication and installation works (piping structure and steel structure) | KCA Deutag | December 2003 – November 2007 | |
Fabrication of Platforms & Walkway/Bridge | Encotec | September 2006 – November 2006 | |
Supsa Pipeline Repair and Excavation Works | AIOC | March 2008 – May 2008 | |
Sumqayıtda Siemens şirkətində trubin qurğusunda təftiş və quraşdırma işləri. | Azenco | March 2007 – May 2008 | |
Fabrication of Piperacks, Control Stations, Access Platforms, CS & SS Pipework & Pipe Supports for Shah Deniz HP/LP Flare Upgrade | BP | December 2011 – December 2014 | |
Asphalt Road Repairs Project at Sangachal Terminal | BP | June 2012 – December 2014 | |
Sanqaçal terminalında DPCU-1 kompressorları üçün boru konstruksiyasının emalatı. | AIOC | February 2013 – June 2014 | |
Fabrication & Painting of Pipe Spools for Gas Lift Compressor Station | CW Singapore PTE | June 2013 – December 2013 | |
Fabrication & Installation Works for Assembly of Patrol Ships | Israel Shipyard Company | June 2014 – November 2014 | |
Fabrication of Piperacks for Shah Deniz 2 Project | Tekfen-Azfen | September 2014 – June 2016 | |
Fabrication of Non-Steel HDPE Pipes for Shah Deniz 2 Project | Tekfen-Azfen | October 2014 – April 2016 | |
Fabrication of CS Pipe Spools for Shah Deniz 2 Project | Tekfen-Azfen | October 2014 – September 2016 | |
Fabrication and installation works for modernization of workshop No.9 project | Bos Shelf | December 2014 – October 2015 | |
Construction of off-site Drainage channel at Sangachal Terminal | AIOC | May 2015 – November 2015 | |
Fabrication Services for 16″ NRV Structure, Mudmat & Tie-in Spools | AIOC | September 2015 – July 2016 | |
Road Repair Works at Sangachal Terminal | BP Caspian Sea | November 2015 – January 2016 | |
Removal of Sleeve (Casing) Enclosing Pipeline, Blasting & Recoating of Pipeline at WREP KP141 | AIOC | November 2015 – February 2016 | |
Excavation of Pipeline & Shoring of Trenches at PSA-2 | BTC | November 2015 – March 2016 | |
Excavation of Pipeline & Shoring of Trenches at PS-05 | AIOC | November 2015 – April 2016 | |
Fabrication of Access Platforms, Walkways & Ladders | Bos Shelf | November 2015 – May 2016 | |
Excavation of Pipeline & Shoring of Trenches | AIOC | May 2016 – August 2016 | |
Xankəndi gəmisində Emalat quraşdırma işləri və NDT xidmətləri. | Baku Shipyard | May 2016 – April 2016 | |
Bilgəhdə körpü konstruksiyasının boyanması və qumlanması | Caspian Road | Fevral 2022 - May 2022 | |
30 inçlik Azpetrol boru xəttinə qoşulma | SOCAR-Midstream | İyun 2022 - Fevral 2023 | |
2 ədəd 137 m3 çənin əsaslı təmiri | Suraxani Oil | Aprel 2022 - İyul 2022 | |
Çən emalatı | TCM-KT | Yanvar 2022 - Oktyab 2022 |
Davam edən layihələr
OSR avadanlığı üçün metal strukturların emalatı. | AIOC | April 2017 – ongoing |
Tank Outage project | AIOC/BPSD | May 2017 – ongoing |
Fabrication & Installation of Pipe Spools & Supports for at SD Pig Receiver Area | BPSD | December 2016 – ongoing |
Fabrication & Installation of Shoring Structures for 12″ Condensate Line Excavation | BPSD | February 2017 – ongoing |
ACG Crude Oil Tank 1 Repair Works | AIOC | November 2016 – ongoing |
Replacement of CAMP Hot Water Lines | BPCS | December 2016 – ongoing |
Drilling 9 boreholes at ST | BPSD | May 2017 – ongoing |
MQS Support for SDT TAR 2017 Activities | BPSD | August 2017 – ongoing |
AÇG 3 saylı aqreqatının isitsmardan çıxarılmasına MQS tərəfindən dəstək işləri. | AIOC | April 2017 – ongoing |
Fabrication of Spools & Supports for SDT TAR 2017 | BPSD | April 2017 – ongoing |
SD Gas Leak 6″ Pipe Repair | BPSD | April 2017 – ongoing |
SD MEG Line Leak Point Repair on 4″ Pipe | BPSD | April 2017 – ongoing |
Construction of Foundations, Fabrication & Installation of Access Platforms | BPSD | April 2017 – ongoing |
Provision of Plant & Equipment for SDT 2017 TAR Activities | BPSD | April 2017 – ongoing |
Fabrication, material supply, painting, assembly and delivery to site of truss in tobacco processing – receiving facility located in Gakh region | Inter Tobacco | May 2017 – ongoing |
Floor Levels La Luna Hotel Steel Work Errection and Substructure Assembly for 2nd and 3rd Lifting | GİLAN HOLDİNQ MMC | 2019 |
DWG – Deep Water Gunashli – Offshore Projects, Shah Deniz – Offshore Projects, Chiraq 1 – Offshore Projects | BP | 2019 |
Qusar 5000 tonluq Soyuducu kompleks | Aqrarko MMC | 2019 |
Zaqatala Fındıq Emalı zavodunun metal konstruksiya işləri | Aqrarko MMC | 2021 |
Heydər əliyev adına Neft Emalı Zavodunun Modernizasiya və Rekonstruksiya layihəsi çərçivəsində Metalokonstruksiya emalatı | AZFEN | İyun 2020 - davam edir |
Sanqaçal Terminalında Çən təmiri | BP | Mart 2022 - davam edir |
Sanqaçal Terminalında Servis işləri | BP | İyun 2021 - davam edir |
BP dəniz platformaları üçün emalat işləri | PDMS Energy | İyun 2020 - davam edir |
Mərkəzi Bankın yeni inzibati binasının tikilməsi layihəsi çərçivəsində metalokonstruksiya işləri | TEKFEN | Yanvar 2023 - davam edir |
Sanqaçal təhlükəsizlik layihəsi çərçivəsində emalat və quraşdırma işləri | BCC Group | İyul 2023 - davam edir |
BP dəniz platformaları və Sanqaçal terminalı üçün emalat və servis işləri | ENCOTEC | Aprel 2023 - davam edir |
Gürcüstan
Tamamlanmış layihələr
SCPX layihəsi üçün qaynaqçıların kvalifikasiya sınağı. | BP | May 2015 - Fevral 2016 |
SD2 - də 101 saylı boru birləşməsi üzrə ayrılan üçlüyün qaynağı. | BP | Mart 2016 - Aprel 2016 |
İstismar zamanı qaynaq işləri (Hot Tap). | BP | Mart 2017 - Aprel 2017 |
Supsa Cost B layihəsi üzrə köpüklü Halqalı borunun dəyişdirilməsi. | BP | Noyabr 2016 - Aprel 2017 |
Supsa B çəninin köpüklü boru dayağının qaynaq təmiri. | BP | Yanvar 2017 - Mart 2017 |
MVS klapanın sınaq xidmətləri. | BP | Fevral 2017 - Aprel 2017 |
PSG1 elektrik toru layihəsinin mexaniki və boru dayaqlarının emalatı. | BP | İyun 2016 - Fevral 2017 |
PSG2 MOL 4 dəyişdirmə işləri. | BP | Sentyabr 2016 - Fevral 2017 |
42” boruların izoliyasiyasının çıxarılması və qumlanması. | BP | Fevral 2017 - Mart 2017 |
EDDF çəninin astarlanması. | BP | Avqust 2016 - Avqust 2016 |
VC çəninin inyeksiya dayağı. | BP | Sentyabr 2016 - Oktyabr 2016 |
PSG1- də EMS yanğın çıxışı pilləkənlərinin quraşdırılması. | BP | Yanvar 2016 - Oktyabr 2016 |
Davam edən layihələr
Supsa Cost D layihəsi üzrə köpüklü Halqalı borunun dəyişdirilməsi. | BP | Oktyabr 2016 - davam edir |
Supsa Cost A layihəsi üzrə köpüklü Halqalı borunun dəyişdirilməsi. | BP | Yanvar 2017 - davam edir |
N2 silindrinin astarının təmiri. | BP | İyul 2016 - davam edir |
Supsa PLR quraşdırma işləri. | BP | May 2017 - davam edir |
Lilo anbarı dəstək xidmətlərinin II mərhələsi. | BP | Sentyabr 2014 - davam edir |
PSG2 - də suyun təmizlənməsi işləri üzrə dəstək xidmətləri. | BP | İyun 2015 - davam edir |
PSG 1 giriş qapısında qaynaq-quraşdırma işləri. | BP | May 2017 - davam edir |
Boruların emalatı xidməti. | Saipem | İyul 2016 - davam edir |
Supsa kamera tutucusunun montaj və sınaq işləri. | BP | Aprel 2017 - davam edir |
PS 13 çəninin çıxış fittinqinin emalatı. | BP | Mart 2017 - davam edir |
İraq
Riyad və Zeqeton kanallarının kəsişməsində 40 düymlük İraq – Türkiyə boru kəmərinin rentgen yoxlanışı və qaynağı. | TRIQUEST INTERNATIONAL GROUP LTD | İyun 2006 - İyul 2006 |
Türkiyə
32 düymlük boru konstruksiyasının hava yastığı ilə qaldırılması/ Sifarişçi: / Türkiyə/ Başlanma: | BTC | Noyabr 2013 - Noyabr 2013 |
Nasos stansiyasında 7 ədəd boru dayağının qaynağı. | BTC | Noyabr 2013 - Noyabr 2013 |
Qazaxstan
Karabatan neft email zavodunun tikintisi. | GATE INSHAAT | 2007 – 2011 |
Boru stellajının emalatı. | ERSAI / Kashagan | 2007- 2011 |
Kaşaqan D Kompleksinin və A adacığının dəniz qurğularının birləşdirmə və istismara vermə işləri. | Aker Kvaerner Contracting AS. | 2007- 2011 |
Birləşdirmə, İlkin istismara vermə və istismara vermə işlərinə dəstək layihəsi. | CCEP | 2007- 2011 |